cell phone jammer has the completely stainless body radiating.
Priority to select a distinctive feature (eg, column-, touch perforation, bone bits) of parts of the. If you select PRO / E 3D benchmark, to indicate the CSO or CSI or DTM's name. In particular shapes, it is difficult to determine the benchmark products , to discuss with the CAM to confirm its base. Products Mould base and center must be an integer, and when the dimension increases in the numbers on the box to show the difference. qualifying internal model to determine the precise time frame X, Y coordinate direction principle: If the internal model was significantly worse intensive frame length and width dimensions, you must take a longer one for the X-axis direction Mould place ranking to match factory machining direction, to reduce the error probability. The stream line production is utilized for cell phone jammer . Maximize the use of standard mold (LKM standard or Hongfeng standards) by working directly change the body font mode, do not move the side rail to side rail on the gong directly in code mode pits. No standard mold and to agree to a competent indicated on the ranking chart. with the CH-type embryos do and CT mold mold pit yards, height and width of about 25 ~ 35mm, the length determined by the height of mold base. top stick hole should be large slender width of mold base processing one or two or four holes (processing a stick over the top hole, the top long do stick, stick the top of the mold base center hole not do.) pore size of 35mm ~ 40mm. Mould height of 400mm or less ( including 400mm included) to do a top stick hole; height of 400mm above the mold base to do the top 2 or 4 stick holes, hole distance based on the information processing. Working principle of cell phone jammer is as follows.cell phone jammer can be installed on the ceiling floor in the middle
Slingshot slingshot hole diameter should be greater than between 1 ~ 2mm in diameter, into the possession of at least B plate depth of 20 to 30mm. Out of the mold base processing map, up to the mold base supplier processing Sprue hole (flange), spring hole, Square recessed installation aids or father to side nail holes, etc.; large mold base (800X800) support the first hole to be processed (including the bottom of the screw holes), orthorhombic avoid empty holes, orthorhombic bronze inserts, color ramps Tsai, line position, line position plate, carrying water, transport buckets, etc.; fine processing outlet outlet must Mould rod, slingshot plastic holes, pull the plastic hole plug screw holes to play, etc.; out of the mold base consult factory before processing map requirements, according to the actual workload of the decision to require processing factory object. cell phone jammer only shields cell phone signal in the examination room.
No comments:
Post a Comment